US Data Centers Report for December, 2024

Chief Executive at aterio.io

US Data Centers Report for December, 2024

The U.S. data center market continues to experience unprecedented growth, driven by the increasing demand for cloud computing, AI technologies, and digital infrastructure. Our latest report, U.S. Data Centers: Insights on Growth and Trends, highlights the active, under-construction, and announced data centers across the nation. Let’s dive into the key statistics and trends shaping this dynamic industry.

Aterio datasets

See the data behind the story

The records behind this article live in the US Data Center Database: Locations and Power Demand dataset.

Data Center Landscape: Active, Under Construction, and Announced

According to Aterio.io’s U.S. Data Center Insights, there are 1,692 active data centers across the country, forming the backbone of digital infrastructure. Additionally, 332 data centers are under construction, reflecting ongoing investment to meet digital demand. Notably, 691 data centers have been announced, signaling strong confidence in the sector's future.

Discover the full breakdown and explore interactive visuals of these statistics in the Aterio.io report.

Key States Leading Data Center Growth

Several states are at the forefront of data center development. Virginia leads with its famed Data Center Alley in Loudoun County, housing a significant portion of global server traffic. Texas and California follow closely, driven by their tech-centric economies and strategic locations. Additionally, Arizona and Oregon stand out for their favorable climates and economic incentives.

Explore the state-by-state data center breakdown in our interactive pages for Virginia, Texas, California, Arizona, and Oregon.

Top Data Center Providers

The U.S. data center landscape is shaped by industry-leading providers, including:

  • Equinix: A global leader with interconnected data centers in major markets.
  • Digital Realty: Renowned for its expansive network of facilities worldwide.
  • CyrusOne: Specializing in enterprise-class data centers.
  • CoreSite: Delivering secure and scalable solutions for cloud and network providers.
  • Iron Mountain: Known for its innovative approach to data center sustainability.

Learn more about how these companies are shaping the future of data infrastructure in our dedicated Top Providers Analysis.

Business Implications and Opportunities

Data centers are the lifeblood of modern enterprises, enabling scalable, secure, and efficient operations. As companies increasingly rely on digital infrastructure, choosing the right data center provider is critical. To guide your decision-making, check out our Comprehensive Guide to Data Center Selection.

Stay ahead in this fast-evolving industry by exploring our full range of reports and insights at the Aterio Insights Hub. From state-specific trends to provider analyses, our resources are designed to equip you with the knowledge to thrive in the digital age.

Keep reading

Side by side satellite views of PORTS Technology Campus Phase 1 in Pike County, Ohio, on October 27 and November 10, 2026, with the West and East building footprints from the site plan overlaid. The November view shows newly cleared ground near both footprints.

PORTS Technology Campus: Dirt Is Moving

Site clearing has started near the first two PORTS buildings in Pike County, Ohio. We estimate 900 to 944 MW of IT capacity across them, with first power expected in 2028.

Aterio Research Team

Research at Aterio

Tombstone Resources concept plan for the AEPCO parcels of Cochise Supercomputer Campus: five 700 MW computing buildings in two groups, with dry coolers, Megapacks and a detention facility

November 4 Findings: SpaceX-Linked 6 GW Campus in Cochise County, Arizona Targets Initial 1.5 GW by 2027

Tombstone Resources has filed for Cochise Supercomputer Campus in Arizona, with SpaceX named as town hall host: 1.5 GW of initial demand, rising to 6 GW at full build out.

Aterio Research Team

Research at Aterio

Optical and thermal aerial views of IREN's Childress campus in Texas, 21 October 2026

Aterio Identifies Potential Horizon 4 Delivery Risk

Our 21 October flyover puts Horizon 4 roughly where Horizon 3 was in late July. Horizons 2 and 3 look on track for Q4 2026; Horizon 4 risks slipping to Q1 2027.

Data Center Research Team

Research at Aterio