Market brief, Ohio

Data Centers in Ohio

Ohio ranks sixth nationally for data center pipeline capacity, with 31,096 MW across 374 projects, 5% of the national total.

By the Aterio data team. Data as of .

Scale

Data centers tracked
395
Data center capacity*
31,096MW
Data center space*
70.2M sq ft
Average operational size
171,889sq ft

Pipeline by stage

In the pipeline
374
Operational
116
Under construction
71
Announced
187

* Pipeline only: operational, under construction and announced projects. The other 21 tracked projects are land bank, delayed, withdrawn or cancelled.

How Ohio compares

Ohio is further along than the US as a whole: only 50% of its projects are still announced, against 59% nationally.

Top states by estimated MWEst. MWFacilities
1.Texas152,429 MW1,431
2.Virginia64,312 MW1,068
3.Utah46,575 MW236
4.Pennsylvania33,239 MW427
5.Georgia32,790 MW481
6.Ohio31,096 MW374

Top five states by pipeline capacity, and Ohio, estimated MW.

Where it is being built

Two counties carry Ohio: Pike County (8,024 MW) and Licking County (7,534 MW), 50% of the pipeline.

Top counties by estimated MWEst. MWFacilities
1.Pike County8,024 MW17
2.Licking County7,534 MW116
3.Butler County1,862 MW25
4.Fayette County1,645 MW23
5.Franklin County1,582 MW41

Top five counties by estimated MW, among those with three or more projects. Projects with no county are left out.

Who is building

Amazon AWS leads with 8,363 MW, ahead of SB Energy with 8,024 MW. The five largest named providers hold 75% of the Ohio pipeline.

Top providers by estimated MWEst. MWFacilities
1.Amazon AWS8,363 MW135
2.SB Energy8,024 MW17
3.Facebook3,422 MW40
4.Google1,831 MW21
5.EdgeConnex1,577 MW8

Top five providers by estimated MW, among those with three or more projects. Undisclosed providers are left out.

From the dataset

Largest data centers in Ohio

Ranked by estimated capacity. Each facility's power and size are available in the full dataset.

  1. 1.Ports Technology Campus DC 11SB Energy · Piketon, Pike CountyAnnounced
  2. 2.Ports Technology Campus DC 14SB Energy · Piketon, Pike CountyAnnounced
  3. 3.Ports Technology Campus DC 7SB Energy · Piketon, Pike CountyAnnounced
  4. 4.Ports Technology Campus DC 16SB Energy · Piketon, Pike CountyAnnounced
  5. 5.Ports Technology Campus DC 15SB Energy · Piketon, Pike CountyAnnounced

Free sample

  • NEO-01 Perkins Township Data CenterAligned Data Centers · Sandusky, Erie CountyPower 108 MWSize 214,000 sq ftUnder construction
    Utility
    Ohio Edison Co
    Expected online
    Dec 31, 2026
  • CMH01 Columbus OH Data Center Phase 15C Data Centers · Springfield, Clark CountyPower 100 MWSize 320,000 sq ftUnder construction
    Utility
    Not assigned
    Announced
    Jun 19, 2024
    Expected online
    Nov 15, 2026
  • Amazon AWS - Beech Building 3Amazon AWS · Johnstown, Licking CountyPower 60 MWSize 215,500 sq ftOperational
    Utility
    Ohio Power Co
    Online
    Nov 15, 2024

Frequently asked questions

Data centers in other states

US Data Centers: Market Analysis & Growth Forecast

Get exclusive insights on the rapidly expanding US data center market, with detailed analysis of facilities, power capacity and strategic expansions across Ohio and the rest of the US.