Lynx is a proposed two phase data centre campus in Sturgeon County, AB, next to the Greenlight Electricity Centre. It has 3.6 GW of load requests with AESO, alongside two proposed gas plants, Sturgeon Gas 1 and 2 (3.7 GW combined), targeting June 2031. Point 54 Power GP Ltd. acquired the site in October 2026.
Hershey, PA